Uniformed drain crew operating a vacuum tanker on a commercial forecourt at dawn, amber beacons lit, hoses connected and taut
FLEET ACTIVE
05:43 GMT · Commercial Forecourt, SE1
London Drainage Infrastructure

The infrastructure partner London property managers actually answer the phone to.

Tankers, jetting rigs, and CCTV cameras covering London and the Home Counties. We clear what others won't quote, maintain what others forget, and document everything your compliance team needs.

Emergency Response

2-hr callout, 24/7/365

Scheduled Maintenance

Planned service agreements

Regulatory Compliance

EA & Ofwat sign-off

Below each division is narrated by the lead engineer responsible for it.

Every case study is drawn from actual work. The names, sites, and outcomes are real. We write them this way because facilities managers making procurement decisions deserve to know exactly who will be on site, what their background is, and how they approach problems — not a brochure claim about “quality service.”

TankeringJettingCCTV SurveysInstallationCompliance Audits
Service Divisions · Engineer Briefings
TANKERING01 / 05
Middle-aged man in orange high-visibility work jacket, confident expression, industrial background

Marcus Webb

Senior Tanker Operator

17 years on the toolsDrain Ltd
1

THE CALL

A facilities manager at a retail park in Croydon called at 06:15 on a Monday. The cesspit serving their food court had reached capacity over the weekend — no warning light, no maintenance contract. Six units were about to open.

2

DIAGNOSIS

On site by 07:40. 12,000-litre cesspit, last emptied 14 months prior. Three inlet pipes showing partial blockage from kitchen grease. The original installation was undersized for the food court footfall.

3

RESOLUTION

Emptied and cleaned in 90 minutes. Ran a camera inspection on the inlets and documented the grease trap situation. Produced a written capacity assessment the same afternoon.

4

OUTCOME

They're now on a quarterly service agreement covering three sites in the portfolio. The capacity report went to their planning consultant for a system upgrade quote. No further emergency callouts in 18 months.

94 min

Avg callout response

47

Sites under agreement

180k

Fleet capacity (litres)

JETTING02 / 05
Professional woman in safety vest, competent expression, industrial work environment

Priya Nair

Lead Jetting Engineer

11 years on the toolsDrain Ltd
1

THE CALL

A housing association in Hackney reported recurring drain blockages across a 1960s estate — 340 units, three separate drainage runs. Previous contractor had attended six times in eight months without resolving it.

2

DIAGNOSIS

Root ingress from two mature plane trees in the central courtyard. The lateral drains at 3m depth had partial collapse in two sections. Previous jetting had cleared symptoms, not cause.

3

RESOLUTION

High-pressure jetting on all three runs, root-cutting nozzle on the affected laterals. Followed immediately by CCTV to confirm clearance and identify the two collapsed sections for patch lining.

4

OUTCOME

Handed the housing association a condition report with GPS-referenced defect locations. Patch lining scheduled for the following month. Zero blockage callouts in the 14 months since.

4,000 psi

Max jetting pressure

8

Rigs available

1,240

Blockages cleared (2025)

CCTV SURVEYS03 / 05
Young professional man in work uniform, focused expression, field environment

Tom Okafor

CCTV Survey Specialist

9 years on the toolsDrain Ltd
1

THE CALL

An estate agent contacted us about a rural property in Surrey — 6-bed farmhouse, private treatment plant, sale falling through because the buyer's solicitor flagged no maintenance records and the system was 22 years old.

2

DIAGNOSIS

Full CCTV survey of the 85-metre drainage run from house to treatment plant. Found root intrusion at two junctions, significant silting in the distribution chamber, and one cracked concrete ring on the primary settlement tank.

3

RESOLUTION

Survey report issued within 48 hours: WRc-coded defect schedule, photographic evidence, condition grade per section, and a remediation cost estimate. Sufficient for the solicitor's requirements.

4

OUTCOME

Sale completed. Client retained us for the remediation work. The new owners are on an annual maintenance agreement. Survey report is now their baseline condition document for future sales or planning applications.

48 hrs

Report turnaround

380

Surveys completed (2025)

100%

WRc-coded reports

INSTALLATION04 / 05
Professional woman in hard hat and safety vest on construction site, reviewing plans

Sandra Kowalczyk

Installation Project Manager

14 years on the toolsDrain Ltd
1

THE CALL

A construction site manager in Hertfordshire needed a temporary sewage treatment solution for a 200-worker site on a 14-month programme. The site had no mains drainage connection and was in an EA groundwater protection zone.

2

DIAGNOSIS

Groundwater protection zone required a packaged treatment plant rather than septic — Environment Agency consent needed before groundbreaking. The programme had no float for a delayed consent.

3

RESOLUTION

We managed the EA consent application, specified a 50PE packaged treatment plant compliant with the Groundwater Regulations, and had plant in the ground 11 days after consent was granted.

4

OUTCOME

Programme maintained. Plant decommissioned and removed at project completion — site restored to pre-installation condition. The same developer has used us on four subsequent sites.

28

Installations (2025)

100%

EA consents managed

18 days

Avg programme: consent to install

COMPLIANCE AUDITS05 / 05
Mature professional man in formal work attire, authoritative expression, office setting

James Archer

Compliance & Regulatory Lead

21 years on the toolsDrain Ltd
1

THE CALL

A commercial landlord with 12 mixed-use properties received an Environment Agency compliance notice — two of their properties had been discharging inadequately treated effluent into a watercourse. Maximum fine exposure: £250,000.

2

DIAGNOSIS

Site audit across all 12 properties. Four had no valid EA consent for their discharge points. Two had treatment plants operating outside consent parameters. Three had no maintenance records at all.

3

RESOLUTION

Produced a compliance action plan within five working days. Managed EA engagement directly. Remediation works and retrospective consent applications submitted within 30 days of instruction.

4

OUTCOME

EA enforcement action withdrawn. All 12 properties now have valid consents, documented maintenance records, and annual audit schedules. The landlord has avoided recurrence and has a defensible compliance position.

34

EA enforcement cases resolved

180+

Properties under compliance mgmt

21

Years regulatory experience

Operational Data & Accreditations

OPERATIONAL DATA · 2025–2026

28min

Median emergency response

Within M25

14

Tankers in fleet

All GVW certified

8

Jetting rigs

Up to 4,000 psi

1,800+

Sites maintained

Active contracts

99.1%

SLA compliance rate

2025 data

21yrs

Regulatory experience

EA & Ofwat

ACCREDITATIONS & REGISTRATIONS

EA

Environment Agency

Registered Waste Carrier

NADC

NADC

National Association of Drainage Contractors

CHAS

CHAS

Contractor Health & Safety Assessment

SC

SafeContractor

Approved Contractor Scheme

9001

ISO 9001

Quality Management

14001

ISO 14001

Environmental Management

Why a Service Agreement

The infrastructure that fails quietly is the infrastructure that costs you most.

A cesspit overfilling on a Bank Holiday weekend, a treatment plant triggering an EA notice, a drain collapse discovered during a sale — these events are predictable and preventable. A service agreement with Drain means scheduled inspections, documented maintenance records, and a single call to people who already know your sites.

Predictable costs

Fixed annual fees replace unpredictable emergency callout invoices.

Compliance records

Full audit trail for EA inspections, property transactions, and planning applications.

Priority response

Agreement clients move to the front of the dispatch queue — always.

Start a Partnership

Set Up a Service Agreement

We'll review your portfolio and propose a maintenance structure within one working day.

We respond within one working day · No obligation

Download Our Maintenance Schedule Template

A ready-to-use annual maintenance planner for property portfolios with private drainage. Used by 200+ facilities managers across London.

24/7 Emergency Line
020 7123 4567

For active blockages, overflows, and cesspit emergencies. Average response within the M25: 28 minutes.